Hemavathi Water to Magadi, Ramanagara and Kanakapura – Somanna Outrage!

Updated: 29-05-2025, 09.03 AM

Follow us:

Tumkur: Hemavathi, who has brought to the farmers of Tumkur district to drain the water to Magadi, Ramanagar and Kanakapura, is being carried out. Somanna has expressed outrage. Now, the controversial Hemavathi Express Link to the farmers of Tumkur, the farmers of Tumkur, and the project to stop the project immediately. Somanna has written to CM Siddaramaiah.

Scientifically studied basic plan and approved DPR. Reported, the Tumkur Branch Canal is about 1289 cusecs in the total flow of water at 70.36. Of these, 901 cusecs of water are allocated to this area of ​​96 km of the Turuvakere, Gubbi, Tumkur and Tumkur rural areas. Also, Kunigal Taluk has 388 cusecs of water. The entire water available in this scheme has already been allocated and how can water supply to other areas through the proposed scheme? The Hemavathi Express Link Canal Peedar Scheme is an unscientific scheme to bring water to the four taluks of Tumkur district and the state’s irrigation minister’s home district.

Hemavathi Express Link Canal Peedar, which is unscientific to the Karnataka Government, will be a curse for the people of Thiruvekere, Gubbi, Tumkur (Rural) and Tumkur (Urban) in Tumkur district. Innocent farmers and technical experts in this area have expressed their opinion that the construction of the Canal will collapse and a shortage of water supply in a timely manner. However, the state government has a soft attitude towards this. The state government’s move to bring injustice to the farmers of this area is absurd to bring water to the Kunigal area, an integral part of the Tumkur district.

How much better is it to be unnecessarily confused by the people of Tumkur, even though there is a lot of water to be provided to the Magadi, Ramanagar and Kanakapura areas through the Manchanabele and Thippagondahalli reservoirs? For whatever reason, there should be no strategic plans for the coordination of the Tumkur district and the tolerance of the masses. The Karnataka State Government hastily unilateral decision without studying the pros and cons of this project is very reprehensible.

Therefore, the masses, farmers and intellectuals should intervene and stop the work before the state government has taken to the streets against the state government. The longest experience, they should be promptly interested in this regard. V. Somanna demanded.

The tense situation in Tumkur should not be given the opportunity to build a situation where innocent people are subjected to police action. Proper action should be taken to prevent law and order. Disciplinary action should be taken against the authorities who have taken over this unscientific scheme and started the work. Immediately stop the workshop of the farmers of Tumkur. Immediately take action and announce the decision of the state government by 31.05.2025. Otherwise, the state government will be fully responsible for the trouble. Somanna said.

Also Read: Dikeshi Kendamandala for the transfer of Chief Engineers – Notice to Chief Secretary to immediately withhold!

Leave a Comment